Saturday, September 2, 2017

I got my v5

Received my v5 on the mail this morning. Completed all paperwork including insurance.

Advised Caterham for them to print and install license plate.

All going well I have the car Thursday 5pm.

Image result for dvla v5

Friday, August 11, 2017

IVA is passed !!!

Just need to post all paperwork to DVLA to get my V5, put a license plate (so another 10 days) and... I am off !!!!


Tuesday, July 25, 2017

IVA failed!

Seat belt buckle too much in the front, and fog and rear lights incorrectly mounted resulted in IVA fail... new test 11/08... gutted...

Monday, July 17, 2017

PBC - and the result is...

My beloved car is now with Caterham.

Just a few niggles found:

Massoubre - 73078

Work required for IVA
Hours
*Bleed brakes
0.5
*Bleed clutch
0.25
*Adjust ride height
0.5
*Remove stickers from dashboard
0
*Headlight & side repeater wiring requires tidying & grommets fitted
2
*Coolant tank is loose and coolant pipes need securing
0.25
*Engine bay wiring tidy
2
*Rectify coolant temp sensor leaking
0.25
*Steering column clamp is fitted upside down and upper column is inserted too far in dash
0.25
Adjust pedal stops
0.25
*Trim needed on fuse box cover & tidy wiring
0.25
*Tidy tunnel wiring & adjust handbrake
0.5
*IVA mirrors are loose - needs securing
0.25
*Additional bond required on front cycle wings
0.25
*Incorrect unions on front brake calipers
0.25
*Oil tank leaking due to damaged thread. Remove tank & try to repair
1
*Remove extra washers on front lower wishbones
0.5
*Re-route dry sump oil pipes to remove kinks
0.5
*Too short bolt used on engine mount earth lead
0.25
*Fit nyloc nuts to rear anti roll bar links
0.25
*Tidy rear wiring
0.25
*Fit spring washer to rear dampers
0.25
*Rear brake hose twisted & shake proof washer missing
0.25
*Remove extra washers from de-dion ear on O/S
0.25
*Rear brake pipe not connected & loose
0.25
*Radiator leaking - may be warranty - requires investigation
0
Total Hours
11.5

Well at least the car will be whole very soon, sound and secure, and IVA-presentable...

11.5h of rework is a bit on the high side but then I am not exactly an experienced mechanic...

Not sure about "incorrect unions of front brake calipers" - sound scary...

Thursday, June 22, 2017

IVA inspection booked

My beloved Caterham will be inspected for IVA on 21st July. Things are getting very, very real !

Thursday, June 15, 2017

Post build check and IVA

Somehow I feel this is a large milestone.

Post Build Check is now booked, Caterham will collect the car on 13th July to rectify all my mistakes (may take some time...) and I posted my IVA application.

Feels like I have a clear deadline (Mid-August) for the car to be ready to roll.

Sunday, April 16, 2017

Progress

With the sunny days more frequent, the garage is warming up and I have been able to make substantial progress.

The engine is fully ready. Electricals all done (I think - still unsecure about starter motor - I need to ask Derek...), hydraulics, all the complicated oil circuit.

It was quite a saga to put fluids in:
   -petrol I managed to spill some from jerricane into the boot of my (regular) car... it's been smelling horrible for 2 weeks now...
   -Oil I managed to spill a nice load on the engine - this is horrible to try to remove
   -Coolant I filled too much - still hoping some internal bubbles will swallow the extra load to avoid using syringe to remove few 100ml's...
   -Brake fluid I can't resolve myself to do it yet... after above issues... one for May I think

The carpets were quite hard to put right, but I am very pleased with final results. Seats were easy to do. The boot carpet and cover is insanely hard... just finished the carpets but the cover is yet to have durable dots on it... next week-end...

Still do do: doors (difficult drilling to hook them on the windscreen), boot cover dots, brake bleeding, coolant bleeding, front cycle wings and repeater, electrical connections for headlights and various IVA stuff. I think I am 90% done. Awesome...